• Skip to main content
  • Skip to footer

ENG-TECH

Engineering and Testing Solutions

  • Home
  • About Us
  • Services
  • Careers
  • Contact Us
  • Twitter
  • Instagam

Lilyfield Road Reconstruction, RM of Rosser, MB

ENG-TECH Consulting Limited (ENG-TECH) completed the requested geotechnical investigation on a designated portion of Lilyfield Road in the Rural Municipality (RM) of Rosser for reconstruction as shown in Figure 1.  This designated portion of Lilyfield Road was approximately 1,700 metres (m) in length, located between Provincial Road (PR) 236 to approximately 100 m west of Summit Road.  Lilyfield Road in the RM of Rosser is also known as Road 68N.  ENG-TECH was informed that traffic usage of this designated part of Lilyfield Road will increase dramatically due to the development of a new quarry, and the roadway surface is to remain granular.  The purpose of the investigation was to assess the soil conditions within the designated portion of Lilyfield Road in order to provide recommendations for two (2) granular surfaced roadway reconstructions with one reconstruction (1) for typical expected rutting, and another reconstruction for expected rutting in the order of 50 to 100 mm. 

Footer

"Engineering and Testing Solutions That Work for You"

Contact us

ENG-TECH
Phone: (204) 233-1694
Email: admin@eng-tech.ca
420 Turenne St, Winnipeg, MB, R2J 3W8

Copyright © ENG-TECH Consulting Limited. Privacy Policy. All Rights Reserved.