• Skip to main content
  • Skip to footer

ENG-TECH

Engineering and Testing Solutions

  • Home
  • About Us
  • Services
  • Careers
  • Contact Us
  • Twitter
  • Instagam

Project Experience

Geotechnical Investigation

  • McNulty Crescent and McNulty Place (20-166-138)
  • Foundation and Slope Stability Assessment – 109 Mayfair Ave, Winnipeg, Manitoba (20-429-01)
  • Hog Barn Site Development and Lined Manure Storage Lagoon, Eddystone, MB (19-130-01 and 20-130-01)
  • Water Line Relocation and Reconnection, Redditt, ON (17-166-10)
  • 30 Acre Greenhouse Project, Dauphin, MB (15-166-96)
  • Gabion Basket Wall Design, University College of the North, Thompson, MB
  • Retaining Wall, Investors Group Stadium, Winnipeg, MB
  • Retaining Wall, Wildewood Residential Development, 761 North Drive (17-166-39)
  • Slope Stability Assessment and Design, Sagkeeng First Nation, MB
  • Annabella Street River Access Walkway Redesign, Winnipeg, MB
  • Crescent Drive Canoe Launch Site, Winnipeg, MB (15-217-01)
  • Historical Grave Site Preservation, Red Rock Lake, MB
  • Slope Stability, Erosion Control and River Access Development, Winnipeg, MB
  • Placement of Rip- Rap Along the Shorelines at 476, 480, 484, 488, 500, 506, 510, 512, 518, 522, 544 and 550 South Drive, Winnipeg, MB (01-045-01)
  • Placement of Rip-Rap for Erosion Protection – 708, 716 (712), 720, 724, 728, 732, 740, 742, 746, and 750 South Drive, Winnipeg, Manitoba (03-284-01)
  • Slope Stability and Shoreline Erosion Protection – 30, 40, 50, 66, 74 and 86 West Gate, Winnipeg Manitoba
  • Slope Stability and Retaining Wall Design, 480 South Drive – Winnipeg, MB (02-166-06)
  • Geotechnical Investigation – Tension Crack Repair and Reshaping of Top of Bank, 484 South Drive, Winnipeg, Manitoba (02-166-07)
  • Slope Stability Remedial Design – 29 to 57 (excluding 53) Mager Drive and 41 to 43 Kingston Row, Winnipeg, MB (06-166-34)
  • Slope Stability Remedial Designs along Several Sections of Shoreline – Sagkeeng, MB
  • Slope Stability and Shoreline Erosion Protection – 30, 40, 50, 66, 74 and 86 West Gate, Winnipeg Manitoba (18-166-20)

Road Design/Investigation

  • Lilyfield Road Reconstruction, RM of Rosser, MB (20-222-02)
  • Mooredale Road (Road 150N), RM of Alonsa, MB (20-166-47)
  • Thompson Drive Reconstruction and Rehabilitation, Thompson, MB (19-163-01)
  • Roadway Investigation, Niverville, MB
  • Curries Landing Road, RM of Cornwallis, MB

Civil Design

  • Amber Gates Apartment, Winnipeg, MB (Phase II 19-429-01)
  • South Landing Drive, RM of Macdonald, MB (19-166-48)
  • Subdivision Land Drainage Design, RM of Tache, MB (17-166-94)  ile des chenes
  • FEDEX Expansion Winnipeg Airport, Winnipeg, MB (16-269-01)
  • Bonavista on the Lake, Winnipeg, MB (19-042-02)


Pile Inspection

  • Pile Inspection – Pembina Hwy Condominium Construction – Winnipeg, MB
  • Pile Inspection – FedEx Facility Expansion, Winnipeg, MB
  • Pile Inspection – Enclave Condominium Multi-Phase Construction – Winnipeg, MB
  • Pile Inspection – Canola Plant – Ste. Agathe, MB

Geotechnical

  • Foundation Design for City Water Treatment Plant Upgrades – Brandon, MB
  • Foundation Design for Water Treatment Plant at Maple Leaf Foods – Brandon, MB
  • Geotechnical Investigations/Assessments for Water Treatment Plants in Haywood, Poplar Bluff, Iles des Chenes, and St. Adolphe, MB
  • Gabion Basket Wall Assessment & Rehabilitation Design – Thompson, MB
  • Gabion Basket Design, Forks Parkade – Winnipeg, MB
  • Geotechnical Investigation and Foundation Design – Mega Greenhouse, Dauphin, MB
  • Foundation Design of Four Proposed Buildings at the 17 Wing North Site – Winnipeg, MB
  • Foundation Design of a Proposed Grain Elevator – Morris, MB
  • Foundation Design of a Proposed Expansion at the 3M Plant – Morden, MB
  • Foundation Design Proposed Arena – Fort Frances, ON
  • Foundation Design for the Opaskwayak Hotel and Office Building – The Pas, MB
  • Foundation Design – Proposed Canadian Tire – The Pas, MB
  • Foundation Design – Proposed Buildings – Poplar Hill First Nation, ON
  • Foundation Design – Proposed Industrial Recycling Plant – Selkirk, MB
  • Foundation Assessment – Proposed Winnipeg Arena – Winnipeg, MB
  • Foundation Design for University of Manitoba Faculty Association Building – Winnipeg, MB
  • Slope Stability Assessment, IKO Plant along Seine River – Winnipeg, MB
  • Slope Stability Assessment and Erosion Protection Design for Bunn’s Creek Walkway – Winnipeg, MB
  • Shoreline Erosion Protection, Hnausa Provincial Park – Lake Winnipeg, MB
  • Slope Stability Evaluation & Erosion Protection Design, 245 Wellington Cr. – Winnipeg, MB
  • Flood Protection Dyke Designs – dozens of Property Owners – Winnipeg, MB
  • Modification to the Turnbull Drive and Wildewood Dykes (Team Member) – Winnipeg, MB
  • Slope Stability Assessment for the Transcona Land Drainage Project – Winnipeg, MB
  • Dolomite Reserve Estimate- Drilling ± 90 Test Holes into Bedrock – Stonewall, MB
  • Field Investigation for Trans Canada Pipelines – Ide des Chene, MB
  • Foundation Inspection of the Rock Sockets for the Norwood Bridge – Winnipeg, MB
  • Foundation Design and Settlement Analysis, 37.5m dia. Manure Storage Tank, Blumenort, MB


Environmental Engineering

  • Phase II, III and Remediation Action Plan combined, Site Assessment and Remediation, Virden, MB
  • Phase III ESA and In-Situ Remediation, Northwestern, ON
  • Phase I, II, III and Remediation Action Plan combined, Environmental Site Assessment, Powerview, Pine Falls, Manitoba
  • Phase II Environmental Site Assessment & Remediation, 101 First Street, Kola, MB
  • Phase I, II & III Environmental Site Assessment, 14 Acre Industrial Site, Winnipeg, MB

Other Enviro Projects:

  • Phase II Environmental Assessment at Moston House – Brandon, MB
  • Metal and Hydrocarbon Assessment at Winnipeg International Airport, Fire Training Area – Winnipeg, MB
  • Metal and Hydrocarbon Assessment at MRM (Mandex) – Selkirk, MB
  • Solvent and Hydrocarbon Assessment – Winnipeg, MB, Thunder Bay, ON
  • Hydrocarbon Assessment at CN Wabowdon Yard – Wabowdon, MB
  • Hydrocarbon Assessment at CN Neebing Yard – Thunder Bay, MB
  • Waste Disposal Pit Assessment at Muskrat Dam First Nation – Muskrat Dam, ON
  • Hydrocarbon Assessment at CN’s Atikokan and Fort Frances Yards – ON
  • Hydrocarbon Assessment – Selkirk, MB
  • Hydrocarbon Assessment – Neepawa, MB
  • Groundwater Seepage Modelling for the Deacon Reservoirs – Winnipeg, MB
  • Geotechnical Modelling and Evaluation for the Jones Road Waste Disposal Grounds – Kenora, ON


Quality Control / Quality Assurance

Materials Testing

  • Thin Lift Overlay PTH 100 (PTH 3 – PR 200)
  • Highway Reconstruction and Bridge Replacement, Russell, Manitoba
  • St. Boniface Industrial Park Phase 2 (Stage 2 & 3), Winnipeg, MB
  • Southwest Rapid Transit (Stage 2) and Pembina Highway Underpass, Winnipeg, MB
  • Enbridge Job 99 – Line 3 Replacement Project and Proposed Pump Station Expansion, MB
  • Rocanville Scissors Creek Shaft Concrete, Saskatchewan, MB
  • Northlands Denesuline First Nation Lagoon Project, Lac Brochet, MB
  • Winnipeg Richardson International Airport
  • Keewatinohk Converter Stations, Gillam, MB
  • Riel Converter Stations, Winnipeg, MB
  • Canadian Forces Base, Shilo, MB
  • Thompson Airport. Thompson, MB
  • Thompson Drive, Thompson, MB
  • Tanco Mine 60, Bernic Lake, MB
  • Hudbay Mining, Snow Lake, MB
  • 777 Mine, Flin Flon, MB
  • Bus Rapid Transit (BRT) – Winnipeg, MB
  • Hwy 10 Rehabilitation – Riding Mountain National Park, MB
  • 17 Wing, Winnipeg, MB
  • Keystone Centre, Brandon, MB
  • RONA Home and Garden – Kenaston and McGillivray, Winnipeg, MB
  • Deloraine School, Deloraine, MB
  • Place Joseph Royal, Winnipeg, MB
  • Swan River Airport-Survey and Materials, Swan River, MB
  • QA for Construction of Flood Protection Dykes – dozens of Property Owners – Winnipeg, MB
  • QA – Modification to the Turnbull Drive and Wildewood Dykes-Winnipeg, MB
  • QC for Construction of Fountain Tire – Winnipeg, MB

Project Management/Project Tender Management

  • Water Pipeline Relocation & Reconnections – Redditt, ON
  • Crescent Drive Park Canoe Launch – Winnipeg, MB
  • Annabella Street Walkway & River Access – Winnipeg, MB
  • La Salle Hotel Flood Protection Works – Winnipeg, MB
  • 1 km of Shoreline Erosion Protection along South Drive – Winnipeg, MB
  • Slope Stability and Retaining Wall Design, South Drive – Winnipeg, MB
  • Slope Stability Evaluation & Erosion Protection Design, Wellington Cr. – Winnipeg, MB
  • Slope Stability Remedial Designs along Several Sections of Shoreline – Sagkeeng, MB
  • Slope Stability Evaluation & Erosion Protection Design & River Access – Winnipeg, MB

Footer

"Engineering and Testing Solutions That Work for You"

Contact us

ENG-TECH
Phone: (204) 233-1694
Email: admin@eng-tech.ca
420 Turenne St, Winnipeg, MB, R2J 3W8

Copyright © ENG-TECH Consulting Limited. Privacy Policy. All Rights Reserved.